A Site Safety Plan is the DOB-required document that lays out how a NYC Major Building will be built safely: perimeter protection, pedestrian routing, fall protection, fire safety, sequencing of major operations, emergency procedures. Without an approved plan, the project cannot pull permits or break ground. Our in-house team prepares, files, and revises Site Safety Plans for projects of every size and complexity.
"A Site Safety Plan shall be prepared, filed with the Department, and approved before the issuance of a permit for any Major Building, demolition, or designated alteration project."
NYC Building Code · §3304
- Cover sheet and project narrative: scope, height, footprint, schedule
- Site logistics drawings: crane, hoist, gate operations, deliveries, lay-down, scaffold, sidewalk shed, perimeter
- Pedestrian protection plan: sidewalk shed, fences, signage, bridges where required
- Fall protection plan: leading-edge work, openings, elevated surfaces
- Fire safety provisions, coordinated with FDNY filings
- Demolition sequence (where applicable)
- Crane and hoisting plan (where applicable)
- Tenant Protection Plan for occupied alteration scope
- TPPN filings for specialized situations
- Filing through DOB NOW (or PW1 for legacy) and one round of objection response
Project intake
Send DOB job number, address, and key project documents. We confirm the credential needed and quote a fixed weekly or hourly rate.
Manager assignment
We match your project to a licensed manager whose experience fits your scope and provide their license number and resume before they start.
Mobilization
Manager visits the site, reviews the approved Site Safety Plan, meets the GC superintendent, and confirms day-one logistics.
On-site coverage
Daily presence aligned to your active hours, including night shifts and weekends if required. Logbook updated in real time and shared weekly.
Project closeout
Final logbook delivered, sign-off on remaining DOB requirements, and the final invoice issued.
We frequently take over plans mid-project from another firm or revise approved plans when project scope changes.
A premium service, quoted per project.
Skilled Safety Management is a premium service. We don't publish standard rate cards because every NYC project has different scope, duration, shift requirements, and complexity factors that materially change the price. We provide a fixed-fee proposal within 24 hours of receiving your project documents.
Factors that affect a quote
- Project size, height, and DOB classification (Major Building, alteration, demolition)
- Project duration: months on the books drive total fee
- Shift requirements: night, weekend, 24-hour operations
- Dual credentials needed (SSM + CSM, SSM + F-89, etc.)
- Complexity and risk profile: adjacent to occupied buildings, transit, landmarks
- Geography: mobilization distance from our Brooklyn HQ
Developers, GCs, and owner-builders preparing to file DOB permits on Major Building projects, plus any occupied-alteration project that requires a Tenant Protection Plan.
Can you prepare a plan for a project that's already started?
Do you also staff the project after the plan is approved?
Will you sign off on a plan you didn't write?
Filing a Major Building permit?
Send architectural and structural drawings plus the schedule. Fixed-fee proposal back in 24 hours. Plan filed in 7–10 business days.